For ECP Ltd. We installed a 106 KWp solar system on the new warehouse in Community 18. System configuration. with this installation ECP Ltd is the first Pharmacy in Ghana that helps saving the environment by producing a great part of the energy by the sun.
System configuration:
- 400x 270wp Trina solar panels
- 5x Fronius Symo inverters
- Ac combinerbox with overvoltage protection
- Fronius PV controller for Genset synchronization
Total estimated power production is approx. 150.000KWh / year. Return of investment approx. 3 year.
Recent Comments